Problem Report: Pathology-p3-e1 cooling issue
Posted by postprob on June 23, 2009 at 09:04 AM
Problem: Pathology-p3-e1 cooling issue Cause: HVAC issues Affects: network equipment Started: 06/22/2009 02:58 PM Resolved: 07/21/2009 09:27 AM
Notes:
Resolved.
According to Facility, HVAC to the SER had to be shutdown to fix flooding in the building.
There is minimal impact at the moment but If prolonged high temperature in the SER, it will affect the network equipment causing potential outage to Wired, wireless, phone and security panels in pathology.
Created: 06/23/2009 09:04:48 by roo
Updates: 07/21/2009 09:27:12 by roo