Scheduled Maintenance
- Scheduled Maintenance: blackboard.case.edu downtime (November 20, 2009)
- Scheduled Maintenance: Cisco Catalyst C-3750 Router, Diner-M1-E1, to be power-cycled. (November 12, 2009)
- Scheduled Maintenance: Mail list archives going offline (November 09, 2009)
- Scheduled Maintenance: Veale-M1-E1; Module 3, WS-X6548-GE-TX; Bus Asic #0 transient Pb error. Recovered. (0x0002, 0x0000): Module needs troubleshooting or TAC (November 06, 2009)
- Scheduled Maintenance: NS2 OS Update (October 16, 2009)
- Scheduled Maintenance: NS3a OS Update (October 16, 2009)
- Scheduled Maintenance: Master Authentication Database (Kerberos KDC) Unavailable (October 16, 2009)
- Scheduled Maintenance: Single Sign On (SSO) Service upgrade/patching (October 16, 2009)
- Scheduled Maintenance: Single Sign On (SSO) Service upgrade/patching (October 16, 2009)
- Scheduled Maintenance: DocShare Service Maintenance (October 16, 2009)
- Scheduled Maintenance: Deploying new version of Google Apps mail migration tool (October 12, 2009)
- Scheduled Maintenance: Teamtrack is being upgraded to Business Mashups (September 29, 2009)
- Scheduled Maintenance: tomlinson-m1-e1, tomlinson-m1-u1, tomlinson-m1-vg248 (September 24, 2009)
- Scheduled Maintenance: blackboard.case.edu downtime (September 02, 2009)
- Scheduled Maintenance: VOIP Phone System Upgrade (August 20, 2009)
- Scheduled Maintenance: PeopleSoft HCM Upgrade (August 12, 2009)
- Scheduled Maintenance: Checkpoint edge firewall node software upgrade (August 07, 2009)
- Scheduled Maintenance: PeopleSoft SIS Bundles 10-12 (August 07, 2009)
- Scheduled Maintenance: REMINDER: Distribution router IOS upgrade (August 06, 2009)
- Scheduled Maintenance: Oarnet maintenance work on network ring containing Cleveland POP (July 27, 2009)
- Scheduled Maintenance: Sympa Mailing Lists and Administrative Aliases Unavailable (July 16, 2009)
- Scheduled Maintenance: Hardware Maintenance on DB7 (July 16, 2009)
- Scheduled Maintenance: blackboard.case.edu downtime (July 13, 2009)
- Scheduled Maintenance: blackboard.case.edu downtime (June 23, 2009)
- Scheduled Maintenance: Electrical Systems Testing (June 22, 2009)
- Scheduled Maintenance: Redundent Internet Connection Test (June 10, 2009)
- Scheduled Maintenance: Second set of Distribution router ROM upgrades (June 10, 2009)
- Scheduled Maintenance: First set of Distribution router ROM upgrades (June 10, 2009)
- Scheduled Maintenance: Renew Security Certificate of Software Center Server (June 10, 2009)
- Scheduled Maintenance: Complete redundant data center patching (June 10, 2009)
- Scheduled Maintenance: NAS unavailable (June 10, 2009)
- Scheduled Maintenance: Internet access (May 28, 2009)
- Scheduled Maintenance: DHCP server for wired network to be failed over (May 22, 2009)
- Scheduled Maintenance: Manual failover of Wired network DHCP services (May 22, 2009)
- Scheduled Maintenance: Manual failover of Wired network DHCP services (May 22, 2009)
